A typed meter-day label, including unsure when the data is too thin.
The situation
An assistant can be asked what an energy meter was doing on a given day. The input is that day’s readings. The answer has to be one label, and someone may act on it.
What was in the way
The assistant does not read the meter. It will still write an answer. A wrong label looks like a right one.
What changed
We put the check in a small server the assistant calls, and we pass that answer back unchanged. The server classifies the day as active, standby, off, or unsure. Unsure is a real answer when the readings are too thin. Three typed tools run over STDIO and Streamable HTTP, with fail-closed validation, an audit log, contract tests, and CI.
What was delivered
Meter MCP. On a sealed 30-day test it was 90.0% correct, against 86.7% for a hand-written rule. The gap is small. The server runs offline, and it declines instead of forcing a label.